Book a demo
All use cases

Electronics.
Board to batch.

Explore connected bills of materials, component readiness, PCB assembly, testing, and serial traceability for electronics teams.

Proposed workflow · explore the scope with Fabrex.

Discuss your workflow
Assembly readinessWorkflow concept

Controller board · Revision C

One component to review

U1U2J1R1R2R3R4R5R6R7R8C1–C6CONTROLLER · REV C

Bill of materials

250 boards · revision C
Select a component to locate its group on the PCB.
Ref.ComponentQty/boardReadiness
U11Ready
U21Ready
J11Ready
R1–R88Ready
C1–C66Review
Build
250 assemblies
BOM
Revision C
Next handoff
SMT assembly
  1. BOM review
  2. Assembly
  3. Functional test
  4. Serial release

Work needs context.

A component substitution or board revision affects purchasing, assembly, testing, and delivery. The whole team needs the same version of the build.

Keep each next step
in the same story.

Build around your process, with the right information for each stakeholder.

Prepare the build

Bring the current BOM, board revision, component availability, and approved substitutions into one review.

Coordinate assembly

Keep SMT and through-hole work, work instructions, batch ownership, and production priorities together.

Connect the test record

Attach inspection outcomes, functional checks, serial references, and rework decisions to the assembly before release.

A controller-board build.

An illustrative job. See the information and decisions each team carries into the next handoff.

PCB revision CBOM · 250 assembliesFunctional-test checklist
  1. Readiness review

    Engineering confirms the board revision and BOM; purchasing flags a component shortage for review.

  2. Assembly batch

    Production keeps the approved instructions, component lots, and batch record together.

  3. Test & release

    Quality connects the test outcome and any rework to the assembly before dispatch.

Workflow illustration · sample data · human review at each handoff

Custom apps.
Your process.

BOM readiness

Board revisions, component shortages, alternative parts, and the person approving each change.

Assembly traveler

The current instruction, production stages, lot references, and the next owner.

Test & release

Inspection evidence, functional-test outcomes, rework, and serial-number handoffs.

Explore the Rex workspace concept
Proposed workflow

This is a proposed electronics workflow. Confirm supported BOM formats, assembly systems, test data, traceability requirements, and integrations with Fabrex. It does not imply available machine control or industry certification.

Your workflow.
Meet Rex.

Start with the work that slows your team down. Explore what Rex and custom apps can do for it.

Book a demo